Premier Inn Heathrow

Leander constructed this hotel in close proximity to Heathrow Airport with a sub 3 week turn around per floor. This project had a unique characteristic of no tower crane after the 5th floor, and so all material and plant was fed through the building using material hoists and motorised shifters. The pre-removal of the crane program using these alternative methods was met and improved. Concrete was placed using static pumps and small concrete skips on forklifts.

Build Specifications

Location: Heathrow Terminal 4, London

Client: S & T Interior Group

Contract Value: £11.0 M

Professional Team: Client Appointed Designers & Leander In House Technical Team

Principal Contractor: S&T Interiors

Our Role: Superstructure Contractor